Premium epoxy floors · Costa Rica
The surfaceis alive.
This is not a photograph: it is marbled epoxy resin flowing in real time. Move across it.Slide your finger over it. We don’t just make beautiful floors — we design art.
- 350 psi bond strength — the concrete gives way first
- Zero VOC · virtually odorless
- 48 h to vehicle traffic
On this surface: Metallic marble · Silver Black · Gloss 62%
10
completed projects
53
real catalog finishes
350
psi bond strength to concrete
48
hours to vehicle traffic
Three systems
One seamless floor, no joints or grout. You choose the character.
Metallic marble
Metallic pigments that flow like liquid marble. No two floors are alike. For living rooms, lobbies and spaces that want to stand out.$100–$120per m² installed · 31 finishesExplore the system →Flake
Decorative flake broadcast to saturation: natural anti-slip texture that hides daily wear. The favorite for garages and retail.$70–$90per m² installed · 15 finishesExplore the system →Solid color
A smooth, uniform surface with a minimal look. For offices, clinics, warehouses and technical areas.Quoted per space · 7 finishesExplore the system →See your space
Upload a photo and see your finished floor.


Finish lab
Design your surface before it exists.
System build-up
- 01Base
- 02Metallic pigment
- 03Veining
Every surface is built in layers. Tones shown are a simulation; final color is confirmed with a physical sample on your substrate.
Just your WhatsApp number and approximate m²: a specialist will message you with a quote for this finish.
Talk to sales on WhatsAppWhere it works
From your home garage to a food processing plant.
Process
Five steps, each one measurable.
- 01
Assess
Free visit: measurements, concrete moisture and pH.
- 02
Design
System, finish and physical sample.
- 03
Prepare
Mechanical grinding and crack repair.
- 04
Install
Layers per system, in 3 to 5 days.
- 05
Deliver
With care recommendations.
Coverage
We come to your space.
FAQ
What almost everyone asks first.
How much does an epoxy floor cost in Costa Rica?
Flake runs $70 to $90 per m² installed; metallic marble $100 to $120 per m². The final amount depends on the area, the condition of the concrete and the finish, and is confirmed in a free on-site assessment.
Can it be installed over existing tile?
In many cases, yes. We assess the bond and condition of the tile, mechanically prepare the surface and apply the system on top, with no demolition.
How long does it take and when can I use it?
A typical installation takes 3 to 5 business days depending on area and weather. You can walk on it after 24 hours and park vehicles after 48 hours.
Does it smell?
The systems we install are zero VOC and virtually odorless, so they can be applied in occupied homes and businesses.