Skip to content
Prime Surfaces

Retail and offices

Epoxy floors for retail spaces and offices

The floor is the first thing your customer steps on and the largest surface in your space. A seamless finish stays sharp with little upkeep and goes in within days, not weeks of closure.

The starting point

The problem with the floor you have

A shop takes more footsteps in a month than a home does in years. The wear is concentrated, and it shows.

Wear paths
In front of the register, at the entrance and along the aisles, tile loses its glaze and the grout darkens exactly where customers look.
Discontinued tile
When a tile cracks, the replacement never matches. The patch stays visible.
Every day of construction is a day without sales
Tearing out and re-laying tile means dust, debris and a closure longer than the business can afford.
A floor that says nothing
In a showroom or a reception area, a generic floor competes with the product instead of elevating it.
The same commercial space with a seamless epoxy floor
Commercial space with its previous floor, before installation
BeforeAfter

The result

What changes with a seamless surface

One piece, wall to wall, in the color and gloss your brand calls for.

  • No grout to darken: nightly cleaning is a mop and neutral soap.
  • Typical installation takes 3 to 5 business days, with foot traffic 24 hours after the final coat.
  • Zero VOC and virtually odorless, which matters in malls and buildings where neighboring tenants stay open.
  • In many cases it goes over the existing floor, with no demolition.
  • The finish is settled on a physical sample: a brand color, a neutral tone, or a metallic that becomes part of the experience.
Metallic marble epoxy finish with a mirror-like reflection

Spec sheet

The numbers behind the finish

3–5 days

typical installation (business days), depending on area and weather

24 h

until foot traffic

0 COV

zero VOC and virtually odorless

350 psi

bond strength: the concrete gives way first

How it’s done

Five steps, no surprises

In commercial spaces the work is planned around your operation: in stages, by sector, or in a short scheduled closure. The calendar is set at the assessment, which is free of charge.

  1. 01

    Assess

    Site visit, measurements and concrete tests: moisture, pH and surface profile.

  2. 02

    Design

    System, finish and a physical sample for you to approve.

  3. 03

    Prepare

    Mechanical grinding or polishing, and crack repair.

  4. 04

    Install

    The layers of the chosen system, 3 to 5 business days depending on area and weather.

  5. 05

    Hand over

    With written care recommendations.

Questions

What clients usually ask

Do I have to close during installation?

The area being coated must stay free of traffic until 24 hours after the final coat. Where the layout allows, we work in sectors so part of the space keeps operating. We define this with you at the assessment.

Is this kind of work allowed inside a shopping mall?

The products are zero VOC and virtually odorless, and preparation is done with mechanical equipment. Each mall management has its own work hours and requirements; we adapt to the ones they give you.

Can you match my brand color?

We work with catalog finishes: 31 metallics, 15 flake blends and 7 solid colors. We help you choose the closest to your identity, and you approve it on a physical sample before installation.

Does it hold up to rolling chairs, shelving and displays?

Yes. It is a commercial-grade coating with a 350 psi bond to the concrete. We recommend protectors on metal legs and avoiding dragging sharp objects.

Your surface starts with a conversation.

Tell us about the space. The on-site assessment is free and comes with measurements, a system recommendation and a firm quote.